01 — PROFESSIONAL EXPERIENCES

01

2023- present

Architectural Services Department, HKSAR

Contract Architectural Assistant (via Shui On, Chun Wo)

Architectural Graduate

Special Design Division, Architectural Branch

In-house design projects, supervised by PPA/Design

A 30-Classroom Primary School at Anderson Road, Sai Kung (target completion 8/2027)

HK$460M Public Works Project, NEC Option B, 3rd-generation MiC, WS2-5

  • Played a key design role and supported the Project Architect
  • Involved in public works procedures, including PQDVC, PWSC, FUAP, QSSP and external audit coordination
  • Supported project delivery through tender preparation with pilot study in contractual BIM; coordinated user meetings with EDB and Po Leung Kuk (user) to address project requirements, submissions to SCCU to respond and comply with statutory requirements, and design and technical coordination with contractors and the project team
  • Undertook procurement of consultancy services, including BIM, BEAM Plus, IIA, modelling and DIA/SIA
  • Supported smart technology implementation, including DWSS and 4S
A 30-Classroom Primary School at Area 11, Fanling, HK (target commencement 2030)

HK$610M Public Works Project, FLN New Development Area, WS1-2, EDB

  • Supported in TFS and prepared PQDVC WS1
  • Pilot adoption of MiC with at least 50% of total construction floor area under DevB TC(W) No.4/2024
Chinese Culture Experience Centre at Kowloon Park, HK (target completion 7/2027)

HK$283M Public Works Project, WS2-5, LCSD, AMO

  • Supported the refurbishment of Grade 1 historic Block 58 and construction of an annex to accommodate public cultural facilities
Hongkong Post's Headquarters Building, Kowloon (completed in 2023)

HK$1600M Public Works Project, WS6, Hong Kong Post

  • Coordinated improvement works and prepared competition submissions
Phase II development of Oi! at North Point (completed in 2022)

HK$28M Public Works Project, WS6, LCSD, AMO

  • Prepared competition submissions
  • Project recognition: HKIA Special Award – Urban Design & Master Planning, 2025; Finalist, HKIA President’s Special Prize, 2022/23
02

2020-2022

Wong Tung & Partners Limited

Year-Out Architectural Assistant

Design for Yee Fung Mixed Use Project at Shenzhen, PRC (completed in 2025)

48,000 m2, 29 stories

  • 深圳市建築師負責制試點項目
  • 深圳市海綿城市規劃設計
Design and Project Admin for Hopson One at Xi’an, PRC (completed in 2023)

Project lead role. 5,000 m2 A&A shopping mall project

  • Presented design directly to Hopson’s senior management in Beijing
  • Prepared technical tenancy frameworks and guidelines
  • Led the Hong Kong project team and coordinated the technical team in Chongqing, delegating responsibilities, reviewing deliverables and coordinating resources to meet quality and programme requirements
  • Provided technical direction and mentored team members to maintain consistency across design and construction documentation
  • Coordinated consultants (i.e. signage, lighting) and stakeholders, monitored outstanding actions and supported team members in resolving design and construction issues
  • Supported parametric design development and implementation
SELECTED PROJECTS
  • Master Planning for Macau Fisherman’s Wharf, PRC
  • Design for GCIG Technology Tower at Huizhou, PRC
  • Design for GCIG Mixed Use Project at Huizhou, PRC
  • Design for New Town Extension (East) in Tung Chung, HK
  • Design for Academic Complex on Ho Sin Hang Campus at HKBU, HK
  • Design for Hong Kong Observatory Headquarter at Tsim Sha Tsui, HK
03

2014-2016

AVT Design Architects Ltd

Assistant Project Manager

Project Assistant

Managed full project scopes across all stages, including programme, tender, cost monitoring and statutory requirements

Liaised with government authorities, clients, users and stakeholders, i.e. BD, FSD and TWGHs, and led consultant teams

Project Management for Residential House at Strawberry Hill, The Peak, HK (completed in 2016)

Project lead role. 3,000 ft2 A&A private residential, demolition and main contract

  • Delivered demolition works and main works contracts through all project stages
  • Administered the tender process from EOI to tender assessment with the developer’s (client) PM team
  • Monitored compliance with statutory requirements and coordinated minor works submissions
  • Managed consultants and contractors, reviewed submissions, coordinated interfaces, and monitored programme and deliverables
  • Developed architectural details and coordinated with contractors on site to resolve construction issues promptly
  • Led and coordinated project tasks within multidisciplinary teams, while supporting and guiding summer interns
Consultancy for Salvatore Ferragamo at Shenzhen Mix-City, HK (completed in 2015)

Project lead role. 2,000 ft2

  • Prepared tender and coordinated the tender process
  • Managed the programme and ensured timely delivery for operational handover
  • Coordinated among the client, designer, contractor and landlord
  • Conducted periodic site inspections and resolved site issues
  • Monitored construction to ensure faithful implementation of the approved design
Consultancy for Facesss at Harbour City, HK (completed in 2016)

13,000 ft2 multi-brand beauty store, tenancy consultancy and project management

  • Coordinated design and technical interfaces among the client, landlord and over 50 international beauty-brand counters
  • Reviewed tenant and shop-drawing submissions, resolved interface and E&M issues, and maintained the overall programme
  • Monitored construction quality to ensure consistent implementation of the approved design across the individual brand areas
SELECTED PROJECTS (COMPLETED)
  • A&A and Interior Work for Giorgio Armani at Plaza 66, Shanghai, PRC
  • A&A Works for TWGHs WCWF Care and Attention Home, HK
  • A&A Works for On Tat Industrial Centre at Fanling, HK
  • A&A and Fitting Out Works for Pacific Club, Harbour City, HK
  • A&A and Fitting Out Works for Bank of China at Sheung Shui, HK
  • A&A and Fitting Out Works for TopShop, Lane Crawford at Asia Standard Tower, HK
  • A&A and Fitting Out Works for Loro Piana at Lee Garden, HK
  • A&A and Fitting Out Works for Sogo at Tsim Sha Tsui, HK
  • A&A and Fitting Out Works for Bank of China TYS, HK
  • Replacement Works for AC System at TWGHs Lui Yun Choy Memorial College, HK
  • Project Management for Ocean Centre Car Park at Harbour City, HK
  • Project Management for Harbour City Gateway Retail Drop-off Area, HK
  • Project Management for Citysuper at Yoho Mall, Yuenlong, HK
  • Consultancy for Salvatore Ferragamo at Macau Galaxy, HK

The Chinese University of Hong Kong - Master of Architecture

The Chinese University of Hong Kong - BSSc Architectural Studies

University of Manchester, UK - Architecture

2025ArchSD ‘Lung Tsun’ Staff Motivation Scheme First Runner-Up

2025APR Urban Design & Architecture Design Awards- Gold Award Winner for Hopson One, Xi’an, PRC

2023Asian Lighting Design Awards- Award of Excellent Light for Hopson One, Xi’an, PRC

2021Dream Impact: Regenerative Urban Design and Sustainable Community Engagement- Award Category ‘Green’